Renascent Demolition is honored to play a key role in Nashville’s next chapter as we prepare for the structural demolition of the old stadium beginning in early 2027. As a locally based company, our team is invested in this community and committed to making this transition as smooth, safe, and respectful as possible for our commercial and residential neighbors. Use this site as your hub for project milestones and stories from the Renascent team working on site, so you can stay informed every step of the way.
Renascent is focused on minimizing disruption wherever possible, with careful attention to sound levels, dust control, and traffic planning throughout the project. The site will also highlight work opportunities, vendor partnerships, and ways local residents can get involved or benefit from the project. Finally, this is a place to ask questions and connect with our team. You are heard and supported, and we want you to be proud of the significant work being done as the great stadium makes way for Nashville’s new beginning.
Demolition Timeline
Renascent Team
Through demolition, decommissioning, and site clearing, we help renew. We enable rebirth. By definition and in name, we are Renascent.
When it comes to demolition, we’re breaking new ground
We do demolition differently. Our professional, strategy-driven approach to demolition is rooted in our core values: safety, intelligence, organization, responsibility, leadership, and competence. Our team members are motivated by tough demolition challenges and a genuine desire to achieve successful outcomes for all stakeholders.
Meet Renatron
| Our Liebherr 9150 High Reach will be an essential tool in reaching the highest portions of the stadium. Nicknamed "Renatron" for its self-assembling capability, it will be a highly identifiable part of our structural demolition fleet. | |
| At 120 ft. | Max 28-ton shearing tool |
| At 170 ft. | Max 15-ton shearing tool |
| Onboard Cameras | 3 |
Subcontracting Outreach
Subcontractors will play a vital role in the safe, efficient, and carefully planned demolition of the old Nissan Stadium. Renascent Demolition is seeking qualified trade partners across a wide range of specialties, with relevant experience, stellar safety records, and the capacity to meet project scheduling and compliance requirements. See the outreach meeting schedule below, where interested subcontractors can learn about project scopes, prequalification requirements, and how to get involved.
This project is about more than just taking down a building—it is about investing in Nashville’s future, and that starts with investing in Nashville’s people. By prioritizing local talent and businesses, Renascent is committed to being a good neighbor and ensuring that the benefits of this work are shared with the community it calls home.
Included Scopes
- Security
- Fencing
- Erosion Control
- Tree Removal
- Job Trailer
- Portable Toilets
- Fuel Delivery
- Trucking
- Refrigerant Recovery
- Universal and E-waste Removal
- Seating Removal
- Field Removal
- and more….
Events
Community Outreach Stadium Tour — 2/25/26 at 1:30 pm
- RSVP by 2/20/26 at:
Community Outreach Events Nissan Stadium Demolition – Fill out form - Meet in Lot H
Community Outreach Meet and Greet — 3/25/26 2-4 pm
- Press Box Trailer, Titans Town, 2300 Woodland Street, Nashville, TN 37213
- RSVP by 3/20/26 at:
Community Outreach Events Nissan Stadium Demolition – Fill out form - Join MS Teams meeting
https://teams.microsoft.com/meet/26341993607869?p=QMVF4sPOaoGKIcblZA
Meeting ID: 263 419 936 078 69
Passcode: MU9o85Z9
Community Outreach Virtual Meetings
4/8/26 2-4pm — 4/22/26 2-4pm — 5/6/26 2-4pm
- RSVP at:
Community Outreach Events Nissan Stadium Demolition – Fill out form - Join MS Teams meeting:
https://teams.microsoft.com meet/25441913278938?p=sscY4kGW00rvEGX4DI
Meeting ID: 254 419 132 789 38
Passcode: fR7B33mQ
Bid Date — 5/16/2026 1pm
- Bid Documents will be available via Building Connected
Career Opportunities
Recycling
In keeping with Renascent's name (which means "renewal"), we expect to recycle, repurpose, or reuse up to 98% of the stadium. Materials such as concrete, brick, wood, metals, and salvageable equipment are all set to be recycled. To minimize costs, mitigate environmental harm, and maximize savings, we process and reuse as much material on-site as possible.
FAQ
This project is focused on safely preparing the site for its next phase, coordinating demolition, recycling, and stakeholder communication.
No. Because of the reach and strength of “Renatron,” everything will be demolished mechanically.
Use the Contact section to reach the appropriate point of contact for scheduling, safety questions, site access, or subcontracting inquiries.
All work follows site-specific safety plans, required PPE, controlled access points, and daily coordination to reduce risk and prevent incidents.
Common recycled materials include concrete, steel, select masonry, and other salvageable components depending on scope and site conditions.
Visit Subcontracting Outreach and Opportunities for qualification steps, submission requirements, and contact details for outreach coordination.
Weather can affect certain activities. Updates will be reflected in Milestones/News if conditions require changes to sequencing or access.
Key notices and updates will be posted on this page (typically under News). For specific documents, use the Contact section to request them.